Due to recent interim regulations implementing state legislation (effective July 2025) and pending changes to the Design Review program and the local codes implementing State Environmental Policy Act (SEPA) requirements, SDCI's Tips, Director's Rules, and other guidance documents may not reflect the most current regulations or requirements. To ensure accuracy and applicability to specific code questions or permit applications, please contact us through our Send Us a Question website.

Tips

Summary: The purpose of this Tip is to provide the architect, engineer, building manufacturer, building supplier, contractor, and plans examiner with information and guidance about the special submittal requirements for prefabricated metal buildings, including those having more than one design engineer.

Date Revised: 07/23/2019