Due to recent interim regulations implementing state legislation (effective July 2025) and pending changes to the Design Review program and the local codes implementing State Environmental Policy Act (SEPA) requirements, SDCI's Tips, Director's Rules, and other guidance documents may not reflect the most current regulations or requirements. To ensure accuracy and applicability to specific code questions or permit applications, please contact us through our
Send Us a Question website.
Tips
Summary: This Tip is designed to help applicants meet the City of Seattle Stormwater Code Green Stormwater Infrastructure (GSI) requirements for Post Construction Soil Quality and Depth. Obtain a copy of the Construction Stormwater Control Plan/Post Construction Soil Management (CSC/PCSM) Plan at the DPD drainage desk.
Date Revised: 11/30/2009
See all Tips