352 ROY ST
Description
Council Land Use Action to allow a contract rezone for a parcel of land from Seattle Mixed Uptown Urban Center with a 65-foot height limit and Mandatory Housing Affordability overlay (SM-UP 65 (M)) to a Seattle Mixed Uptown Urban Center with an 85-foot height limit and Mandatory Housing Affordability ... More Council Land Use Action to allow a contract rezone for a parcel of land from Seattle Mixed Uptown Urban Center with a 65-foot height limit and Mandatory Housing Affordability overlay (SM-UP 65 (M)) to a Seattle Mixed Uptown Urban Center with an 85-foot height limit and Mandatory Housing Affordability overlay (SM-UP 85 (M)). Project includes future construction of an 8-story, 218-unit apartment building with retail. Parking for 128 vehicles proposed. Existing buildings to be demolished. (Clerk File #314534) Less
Project Milestones
-
Neighborhood Outreach
active
[process] 10/28/2023 - Revised
Record Number: 004976-23PA
The applicant is conducting neighborhood outreach with communities near this project to share information about the development and to gather community input on local context and future development.
-
Early Design Guidance
active
[process] 10/31/2023 - Revised
Record Number: 3041355-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
active
[process] 9/3/2024 - Revised
Record Number: 3041336-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
completed
Published 6/5/2025 - Revised
Record Number: 3041336-LU
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
future
Issued - Revised
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
future
[process] - Revised
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.