1107 NE 45TH ST
Description
Land Use Application to allow a 28-story, 336-unit apartment building with retail. Parking for 92 vehicles proposed. Existing building to be demolished. Early Design Guidance conducted under 3038409-LU.
View Design Proposal (46 MB)
Project Milestones
-
Neighborhood Outreach
completed
[process] 8/24/2021 - Revised 10/13/2021
Record Number: 005483-21PA
The applicant is conducting neighborhood outreach with communities near this project to share information about the development and to gather community input on local context and future development.
-
Early Design Guidance
active
[process] 8/12/2021 - Revised
Record Number: 3038409-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
active
[process] 3/3/2022 - Revised
Record Number: 3038399-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
future
Published - Revised
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
future
Issued - Revised
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
active
[process] 5/9/2023 - Revised
Record Number: 6859479-CN
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
005483-21PA Building & Land Use Pre-Application
3038399-LU Master Use Permit
- Design Review Recommendation Report (569 KB)
- Design Review Recommendation Proposal - Final (46 MB)
- All documents for this record
3038409-EG Early Design Guidance
- Department of Neighborhoods Community Outreach Package (1886 KB)
- Design Review EDG Proposal - Final (67 MB)
- All documents for this record
6859479-CN Construction Permit
6859483-DM Demolition Permit
6878461-PH Phased Project Permit
Make a Comment
We want to hear from you: send us your comments on this project. Be sure to make your comments count.
Your email address and comments, in their entirety, will be entered into the public record for this project and posted on our website, and may be subject to public disclosure requests.