2234 2ND AVE
Description
Land use application to allow an 8-story, 59-unit apartment building (12 small efficiency dwelling units and 47 apartment units) with retail. No parking proposed.
View Design Proposal (33 MB)
Project Milestones
-
Neighborhood Outreach
completed
[process] 8/14/2019 - Revised 9/6/2019
Record Number: 004061-19PA
The applicant is conducting neighborhood outreach with communities near this project to share information about the development and to gather community input on local context and future development.
-
Early Design Guidance
completed
[process] 12/8/2015 - Revised 12/8/2015
Record Number: 3020027-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
active
[process] 10/10/2019 - Revised
Record Number: 3020027-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
future
Published - Revised
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
future
Issued - Revised
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
future
[process] - Revised
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
004061-19PA Building & Land Use Pre-Application
3020027-EG Early Design Guidance
3020027-LU Master Use Permit
- Design Review Recommendation Report (345 KB)
- Design Review Recommendation Proposal - Final (33 MB)
- All documents for this record
3041634-LU Master Use Permit
3041635-LU Master Use Permit
6562449-CN Construction Permit
6744078-CN Construction Permit
7009498-CN Construction Permit
7042423-DM Demolition Permit
- Permit (601 KB)
- All documents for this record
Make a Comment
We want to hear from you: send us your comments on this project. Be sure to make your comments count.
Your email address and comments, in their entirety, will be entered into the public record for this project and posted on our website, and may be subject to public disclosure requests.