Due to recent interim regulations implementing state legislation (effective July 2025) and pending changes to the Design Review program and the local codes implementing State Environmental Policy Act (SEPA) requirements, SDCI's Tips, Director's Rules, and other guidance documents may not reflect the most current regulations or requirements. To ensure accuracy and applicability to specific code questions or permit applications, please contact us through our Send Us a Question website.

Tips

Summary: This Tip discusses the regulations for renewable energy and solar-ready roofs for commercial buildings as outlined in the 2015 Seattle Energy Code. The “Commercial Building” provisions in the Energy Code have two different rules relating to solar energy. 1. A smaller renewable (solar) energy system that you install at the time of construction. (Section C411) 2. A solar-ready roof to facilitate a larger solar energy installation in the future. (Section C412)

Date Revised: 04/24/2025

See all Tips