Due to recent interim regulations implementing state legislation (effective July 2025) and pending changes to the Design Review program and the local codes implementing State Environmental Policy Act (SEPA) requirements, SDCI's Tips, Director's Rules, and other guidance documents may not reflect the most current regulations or requirements. To ensure accuracy and applicability to specific code questions or permit applications, please contact us through our Send Us a Question website.

Tips

Summary: This Tip explains key rules in the 2021 Seattle Energy Code that apply when you replace existing mechanical equipment in most commercial and multifamily buildings. If you replace a boiler, furnace, water heater, or air cooled chiller, you usually must install an electric heat pump system. Some exceptions allow you to delay the full upgrade or keep part of your existing system.

Date Revised: 10/15/2026