Tips

Summary: This Tip is designed to help applicants meet the City of Seattle Stormwater Code Green Stormwater Infrastructure (GSI) requirements for Post Construction Soil Quality and Depth. Obtain a copy of the Construction Stormwater Control Plan/Post Construction Soil Management (CSC/PCSM) Plan at the DPD drainage desk.

Date Revised: 11/30/2009

See all Tips