2025 5TH AVE
Description
Land Use Application to allow a 44-story, 461-unit apartment building with retail. Parking for 307 vehicles proposed. Review includes demolition of existing structure and parking lot. Project relies on a pending MHA up zone (Mandatory Housing Affordability).
View Design Proposal (27 MB)
Project Milestones
-
Early Design Guidance
completed
[process] 10/25/2016 - Revised 10/25/2016
Record Number: 3026266-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
completed
[process] 4/17/2017 - Revised 2/16/2023
Record Number: 3026266-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
completed
Published 2/16/2023 - Revised
Record Number: 3026266-LU
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
completed
Issued 6/7/2023 - Revised
Record Number: 3026266-LU
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
active
[process] 1/23/2020 - Revised
Record Number: 6563314-CN
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
3026266-EG Early Design Guidance
3026266-LU Master Use Permit
- Design Review Recommendation Report (349 KB)
- Permit (25 KB)
- Design Review Proposal (27 MB)
- PUBLISHED Decision/Recommendation (532 KB)
- All documents for this record
6508350-CN Construction Permit
6563314-CN Construction Permit
6699510-PH Phased Project Permit
- Permit (74 KB)
- All documents for this record
6699514-DM Demolition Permit
- Permit (399 KB)
- All documents for this record
6911341-GR Grading Permit
6911443-CN Construction Permit
6933241-SS Side Sewer Permit
- Permit (20 KB)
- All documents for this record