Land Use application to allow an 11-story, 129-unit apartment building with 37 short-term rental units and retail. Existing building to be demolished. Parking for 34 vehicles proposed. Early Design Guidance conducted under 3036130-EG.
View Design Proposal (20 MB)
Project Milestones
-
Neighborhood Outreach
completed
[process] 2/11/2020 - Revised 2/13/2020
Record Number: 000399-20PA
The applicant is conducting neighborhood outreach with communities near this project to share information about the development and to gather community input on local context and future development.
-
Early Design Guidance
completed
[process] 2/12/2020 - Revised 1/11/2021
Record Number: 3036130-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
completed
[process] 12/18/2020 - Revised 11/3/2022
Record Number: 3036133-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
completed
Published 11/3/2022 - Revised
Record Number: 3036133-LU
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
completed
Issued 3/27/2023 - Revised
Record Number: 3036133-LU
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
future
[process] - Revised
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
000399-20PA Building & Land Use Pre-Application
3036130-EG Early Design Guidance
- Department of Neighborhoods Community Outreach Package (4 MB)
- Design Review EDG Proposal - Final (26 MB)
- All documents for this record
3036133-LU Master Use Permit
- Design Review Recommendation Report (475 KB)
- PUBLISHED Decision/Recommendation (562 KB)
- Design Review Recommendation Proposal - Final (20 MB)
- Permit (22 KB)
- All documents for this record