1422 SENECA ST
Description
Land Use Application to allow an 18-story, 135-unit apartment building (68 small efficiency dwelling units and 67 apartment units). No parking proposed. Existing building to be demolished. Early Design Guidance review conducted under #3034493-EG.
View Design Proposal (9 MB)
Project Milestones
-
Early Design Guidance
completed
[process] 5/22/2019 - Revised 9/19/2019
Record Number: 3034493-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
completed
[process] 11/21/2019 - Revised 1/13/2022
Record Number: 3034443-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
completed
Published 1/13/2022 - Revised
Record Number: 3034443-LU
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
completed
Issued 2/16/2022 - Revised 10/7/2022
Record Number: 3034443-LU
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
active
[process] 2/26/2021 - Revised
Record Number: 6727192-CN
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
001718-19PA Building & Land Use Pre-Application
3034443-LU Master Use Permit
- Design Review Recommendation Report (450 KB)
- Permit (22 KB)
- PUBLISHED Decision/Recommendation (365 KB)
- Design Review Recommendation Proposal - Draft (9 MB)
- Design Review EDG Proposal - Draft (9 MB)
- All documents for this record
3034443-LU-008 Revision Request - Land Use
3034443-LU-009 Revision Request - Land Use
3034493-EG Early Design Guidance
- Department of Neighborhoods Community Outreach Package (2 MB)
- Design Review Recommendation Proposal - Final (9 MB)
- All documents for this record
6727192-CN Construction Permit
6780164-DM Demolition Permit
- Permit (598 KB)