1906 20TH AVE S
Description
Land Use Application to allow an 8-story, 203-unit apartment building with retail. Parking for 80 vehicles proposed. Existing buildings to be demolished. Early Design Guidance Review conducted under 3037740-EG.
View Design Proposal (19 MB)
Project Milestones
-
Neighborhood Outreach
completed
[process] 2/11/2021 - Revised 6/29/2021
Record Number: 000618-21PA
The applicant is conducting neighborhood outreach with communities near this project to share information about the development and to gather community input on local context and future development.
-
Early Design Guidance
completed
[process] 2/24/2021 - Revised 10/18/2021
Record Number: 3037740-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
completed
[process] 11/23/2021 - Revised 3/20/2023
Record Number: 3037697-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
completed
Published 3/20/2023 - Revised
Record Number: 3037697-LU
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
completed
Issued 4/13/2023 - Revised
Record Number: 3037697-LU
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
active
[process] 4/6/2022 - Revised
Record Number: 6823910-CN
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
000618-21PA Building & Land Use Pre-Application
3037697-LU Master Use Permit
- Design Review Recommendation Report (420 KB)
- Permit (22 KB)
- PUBLISHED Decision/Recommendation (430 KB)
- Design Review Recommendation Proposal - Final (19 MB)
- All documents for this record
3037740-EG Early Design Guidance
- Department of Neighborhoods Community Outreach Package (3 MB)
- Design Review EDG Proposal - Final (120 MB)
- All documents for this record
6823910-CN Construction Permit
6823911-DM Demolition Permit
- Permit (400 KB)
- All documents for this record
6979679-SS Side Sewer Permit
- Permit (20 KB)
- All documents for this record