1931 2ND AVE
Description
Land Use Application to allow a 42-story hotel building with 200 apartment units and retail. Parking for 170 vehicles proposed. Existing buildings to be demolished; existing façade (Terminal Sales Building Annex) to remain. Design Review conducted under Project #3033067-EG.
View Design Proposal (8 MB)
Project Milestones
-
Early Design Guidance
completed
[process] 10/5/2018 - Revised 9/20/2019
Record Number: 3033067-EG
SDCI is reviewing the project site, proposed development, and early design concepts for the conceptual design using the adopted design guidelines.
-
Land Use Application Review
completed
[process] 2/11/2008 - Revised 2/8/2024
Record Number: 3007606-LU
SDCI has received the application and is conducting reviews to make sure it meets our land use code. This application may include a public notice and comment period.
This project may need additional design and architectural analysis, and environmental (SEPA), geotechnical, and zoning reviews.
-
Land Use Decision/Recommendation
completed
Published 12/18/2008 - Revised
Record Number: 3007606-LU
SDCI has published a land use decision or recommendation on whether the project meets the requirements of the Seattle Municipal Code. An appeal period follows this publication date.
-
Land Use Permit
completed
Issued 2/18/2009 - Revised
Record Number: 3007606-LU
SDCI has issued the land use permit. The project can now start applying for any required construction permits.
-
Construction Application Review
active
[process] 6/23/2020 - Revised
Record Number: 6774627-CN
SDCI has received the application and is conducting reviews to make sure it meets our codes and requirements.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Permit
future
Issued - Revised
SDCI has issued the building permit and construction may begin.
Note: When there are multiple construction permits on a project, it is possible for one construction permit to be issued while another construction application review at the same address is in progress. To view all permit activity, see Project Records and Documents below.
-
Construction Completed
future
- Revised
All construction work has finished. If this step is active, then only final paperwork is keeping this project open.
Project Records and Documents
014413-18PA Building & Land Use Pre-Application
3007606-LU Master Use Permit
3017317-LU Master Use Permit
- Design Review Proposal (7 MB)
- Permit (109 KB)
- PUBLISHED Decision/Recommendation (623 KB)
- All documents for this record
3031140-LU Master Use Permit
- Design Review Recommendation Report (462 KB)
- Permit (115 KB)
- PUBLISHED Decision/Recommendation (428 KB)
- Design Review Recommendation Proposal - Final (8 MB)
- All documents for this record
3033067-EG Early Design Guidance
- Design Review Proposal (22 MB)
- Department of Neighborhoods Community Outreach Package (9 MB)
- All documents for this record